TP-LINK TL-SL2210WEB/TL-SL2218WEB Manuel D’Utilisation

Page de 64
      14
Gigabit Uplink Web Smart Switch 
Verify Installation
211 
After completing the installation, please verify the following items:
There are 5~10cm of clearance around the sides of the device for ventilation and 
 
the air flow is adequate.
The voltage of the power supply meets the requirement of the input voltage of the device.
 
The power socket, device and rack are well grounded.
 
The device is correctly connected to other network devices.
 
Power On
212 
Plug in the negative connector of the provided power cord into the power socket of the 
device, and the positive connector into a power outlet as the following figure shown.     
Connecting to Power Supply
Figure 4-3 
Note: The figure is to illustrate the application and principle. The power plug you get 
from the package and the socket in your situation will comply with the regulation in 
your country, so they may differ from the figure above.
Connection