Hunter Engineering Heavy-Duty Fiche Technique

Page de 2
LAY-O
UT       Construct pit per referenced forms.   
PF Heavy Duty Alignment Pit System
Pit Rack
Form 6942-T, 03-15a
Copyright © 2015, Hunter Engineering Company
The following items are to be supplied by the customer:
Concrete to construct pit / Concrete reinforcement / Electrical fixtures, wiring, and power (if necessary) / Piping / 
Pit ventilation materials / Drainage materials / Edging (see blue prints) / Railings / lifting equipment for installation.
15 ft.
(4572 mm)
10 ft. max.
(3048 mm)
20 ft.
(6096 mm)
61 5/8 in.
(1565 mm)
(for Min.)
Minimum
12 ft. 10 in.
(3911 mm)
34 in.
(864 mm)
Pit Depth - 58 in.
(1473 mm)
18 in.
(457 mm)
15 ft.
(4572 mm)
10 ft. max.
(3048 mm)
61 5/8 in.
(1565 mm)
(for Min.)
Minimum
12 ft. 10 in.
(3911 mm)
PF - 58 in.
(1473 mm)
Pit Depth
18 in.
(457 mm)
PF Pit Layout 
with optional T-Pit 
 
Kit 20-869-1 (20 feet) shown
Kit 20-1517-1 (+10 feet) not shown
PF Pit Layout 
without optional T-Pit