Enterasys Networks SecureStack C2 C2RPS-POE Manuel D’Utilisation
Rack Mounting the C2RPS-POE
2-6 Installation
Attaching Brackets and Installing in Rack
Proceed as follows to install the switch into a 19‐inch rack:
1.
, using the eight
M3 x 6 mm flathead screws shipped with the switch.
Figure 2-3 Attaching the Rackmount Brackets
2.
With the mounting brackets attached, position the switch between the vertical frame
members of the 19‐inch rack as shown in
members of the 19‐inch rack as shown in
. Then fasten the C2RPS‐POE
securely to the frame using four mounting screws (user supplied).
Figure 2-4 Fastening the C2RPS-POE to the Rack
3.
If you are installing the C2RPS‐POE in a stacked configuration, repeat this procedure
for each C2RPS‐POE, then proceed to “
for each C2RPS‐POE, then proceed to “
1 Rackmount brackets (2)
2 M3 x 6 mm flathead screws (8)
1 Rails of 19-inch rack
2 Mounting screws (supplied by user)
Á
À
Á
À
C2RPS-POE
POWER
C2RPS-POE
POWER
À
Á
Á
À