NetShelter CX Enclosure: Installation and Customization
Equipment Planning Guidelines
Please note the following guidelines for proper installation and operation of hardware in a NetShelter CX 
Enclosure. 
Avoid clustering hot-running equipment 
such as servers, dense redundant arrays of 
independent disks (RAID), and large 
voice-over-internet-protocol (VOIP) 
switches in one part of the enclosure. 
Distribute the thermal load evenly up and 
down the enclosure such that each fan 
module supports an equal amount of the 
thermal load. 
Each fan module has a triangular metal 
section protruding slightly into the 
enclosure. This does not create an issue for 
installation of most equipment, but to 
allow for ample cabling space to the rear 
of the enclosure, deep servers should be 
installed in the enclosure space above and 
below these triangular metal protrusions.