Summit SP6DS2D7ADA Manuel De Montage
1) Peel back the gasket and attach the overlay panel
to the drawer face using the 4 supplied screws and
thru the 4 existing clearance holes.
2) Install both drawers back into unit.
to the drawer face using the 4 supplied screws and
thru the 4 existing clearance holes.
2) Install both drawers back into unit.
19 3/8
Step 3
1) If reusing the handle that came with the unit, drill two
holes 19 3/8" apart and a minimum of 1 1/4" from the
top.
2) Screw handle on using the supplied screws. Drive screws
flush with panel. Screws are designed for 3/4" overlay panel.
If thickness other than this is used, customer will supply.
holes 19 3/8" apart and a minimum of 1 1/4" from the
top.
2) Screw handle on using the supplied screws. Drive screws
flush with panel. Screws are designed for 3/4" overlay panel.
If thickness other than this is used, customer will supply.
1 1/4
2 of 2
Q119
05/23/11
Q119
05/23/11
M4 x 25
Flat Head
2 Places
Flat Head
2 Places
Overlay
Panel
Panel
#10 x 1.75"
2 Bottom
2 Bottom
Step 4
#10 x 1.75"
2 Top
2 Top