Netcomm NCT240 Manuel D’Utilisation

Page de 38
NetComm NCT240 Installation Guide                                                   Release 1.0 
 
 
Proper grounding (earth) 
Proper Grounding is a very important part of the electrical installation for NCT240, if 
noise is present in the Electrical ground this noise can leak to the ADSL circuit through 
the Surge protectors and interfere with the proper operation of ADSL links. 
 
*** both AC/DC power supplies are isolated from the NCT240 ground therefore the 
Grounding procedure is the same regardless of what the power supply is .   
 
NCT240 Ground: 
 
 
Grounding procedure: (FIX Picture)   
 
 
NCT240 
NCT240
 
 
 
15