Manuel D’UtilisationTable des matières1.0 INTRODUCTION12.0 SAFETY12.1 General12.2 Training12.3 Safety Features12.4 Safety Labels22.5 Safety Precautions22.5.1 Electrical Hazards22.5.2 Burn, Fire, and Explosion Hazards22.5.3 Crush Hazards32.5.4 Chemical Hazards32.5.5 Pressure Hazards42.5.6 Slip, Fall Hazards43.0 INSTALLATION53.1 Receiving and Storage53.1.1 Initial Inspection53.1.2 Storage Prior to Installation53.2 Compliance with Codes53.3 Setup53.3.1 Foundation53.3.2 Placement53.3.3 Clearances63.4 Electrical Connections63.5 Combustion Air73.6 Flue Venting73.6.1 Vent Elbows83.6.2 Barometric Damper83.6.3 Automatic Vent Damper83.6.4 Flue Connection83.6.5 Vent Termination83.6.6 Removing an Existing Boiler93.7 Gas Piping93.8.1 Piping Design113.7.1 Gas Supply Piping by Installer113.7.2 Gas Bleeds and Vents by Installer113.8 Boiler Water Piping113.8.3 Boiler Water Piping by Installer123.8.4 Flushing and Filling133.8.5 Water Quality133.9 Burner and Ignition System133.9.1 Inspection133.10 Pre-Start Check List133.11 Safety Checks143.11.1 Test of Ignition Safety System143.11.2 Test of Low Water Cut-off143.11.3 Test of Limit Controls143.11.4 Test of Low Gas Pressure Switch153.12 Initial Adjustments153.12.1B Optional Remote Control203.12.2 Air Flow Adjustments203.12.3 Gas Pressure Adjustment214.0 OPERATION224.1 General224.1.1 Control Panel Front224.2 Lighting and Shut-Down Procedures224.2.1 Lighting Procedures224.2.2 Normal Shut Down Procedures234.2.3 Emergency Shut Off234.3 Typical Boiler Operating Conditions235.0 MAINTENANCE245.1 Maintenance and Inspection Schedule245.1.1 Daily245.1.2 Weekly245.1.3 Monthly (During Operation)245.1.4 Semi-Annually245.1.5 Annually255.2 Cleaning the Burner255.3 Removing the Exchanger265.4 After All Repairs or Maintenance265.5 Sequence of Operation275.5.1 Standard Modulating275.5.2 IRI Modulating285.6 Troubleshooting296.0 PARTS/TECHNICAL SUPPORT316.1 Schematic Diagrams31Diagram33Logic Diagram34Options - Logic Diagram35IRI Unit - Local Control - Logic Diagram36Diagram38Logic Diagram39Standard Unit – Panel Layout40IRI Unit – Panel Layout416.2 Boiler Parts List426.2.1 Main Assembly426.2.2 Control Panel436.2.3 Gas Trains456.2.4 Cabinet497.0 LIMITED WARRANTY50Taille: 2,2 MoPages: 54Language: EnglishOuvrir le manuel