Energy Tech Laboratories DSH Manuale Utente

Pagina di 24
FORM 145.32-IOM1 (908)
7
JOHNSON CONTROLS
UNIT MOUNTING 
The 2 through 5 ton unit consist of an evaporator and 
condenser module. These two modules are rigidly at-
tached by a joining strip across the top of the two cabinet, 
and two long side cross-member angles which bridge the 
mounting channels on the bottom of the unit. These units 
may be field split to allow for passage through doors, 
elevators, hallways, etc. Alternatively, the units may be 
installed as a split system after separation. 
Units may be either hung, or floor mounted. If unit is to 
be hung, use all mounting points indicated - regardless 
if unit is installed as a package or split system (See unit 
dimension drawings). Use of 1/2in. dia hanger rods is 
recommended. Ensure the attachment point of the rods 
to the building structure is sufficient to support the unit 
weight. In order to ensure efficient condensate drain-
age, the unit may be pitched towards the evaporator 
end of the unit. 
A minimum of 4-in. clearance is required under the unit to 
allow for trapping of the evaporator condensate drain. 
Floor mounted units should be secured on a solid, level 
pad. The use of isolating vibro-pads at several points 
under the bottom mounting channels is recommended. 
Ensure that provision is made for clearance to install a 
trap on the condensate drain outlet.