IBM OS/390 Manuale Utente
25.4.2.5 Setting Up Critical Operations Procedures
You should set up, test, and document procedures that are critical to the smooth
operation of your system. Here is a sampling:
operation of your system. Here is a sampling:
•
System IPL, JES2 warm-start
•
JES2 checkpoint reconfiguration
•
JES2 ABEND and hot-start
•
System shutdown
•
VTAM startup and shutdown
•
VTAM vary node active and inactive
•
Switching devices between systems
•
System recovery, restart, and first-failure data capture
•
Stand-alone dumps
•
Managing spool space and spool full conditions
•
System backup (full and partial)
•
Emergency system restore
See Chapter 28, “Orientation to OS/390 Console Operation” on page 443 for
some examples of OS/390 console operation.
some examples of OS/390 console operation.
25.4.2.6 Managing Change
As you apply maintenance and make changes to your configuration, follow these
simple rules:
simple rules:
•
Make changes incrementally, not many at once.
•
Test the effects of each change to make sure you do not regress your
system.
system.
•
Make sure you can back out changes in the event of a problem.
•
Document all changes, don
′
t rely on your memory.
•
Adhere to the age-old
″
Keep it Simple (KISS)
″
philosophy to minimize
unnecessary complexity in your system.
These guidelines are critical to the migration project, especially as you approach
the switch-over time.
the switch-over time.
25.4.2.7 Managing Problems
Staying on top of problems is important, especially with a project as massive as
converting from VSE to OS/390. Use a process and tools with which you are
familiar, perhaps what you are currently using with your VSE system. In addition,
you might want to set up a “strategy room” and large marker boards for
managing problems at switch-over time.
converting from VSE to OS/390. Use a process and tools with which you are
familiar, perhaps what you are currently using with your VSE system. In addition,
you might want to set up a “strategy room” and large marker boards for
managing problems at switch-over time.
In addition, we recommend you keep your software service at a current level to
minimize the possibility of rediscovering old problems. See 25.5.1.2, “Applying
Preventive Service” on page 414.
minimize the possibility of rediscovering old problems. See 25.5.1.2, “Applying
Preventive Service” on page 414.
Chapter 25. Prepare the Migration Environment
411