Bakers Pride FKM Manuale Utente

Pagina di 60
Electric Pressure Fryer 
 
Operation 
 
 
17 
14.  Remember to filter the shortening at least every third frying cycle load. Refer to the procedure in 
this manual. Also filter the shortening and clean the fryer at the end of each day. If you do not 
plan to use the fryer for an hour or more, turn the thermostat down to 150 and close the lid. 
 
15.  When you have finished frying for the day, turn the FILTER/OFF/FRY switch to the OFF position. 
FKM-FC Operation 
System Programming 
Use the following figure and table to set options that apply to each product programs. 
 
 
 
Figure 1. System Programming Sequence