Newco smart cup Guida Al Funzionamento

Pagina di 24
Installation and Operation Instructions: SMART CUP Brewing System
INSTALLATION INSTRUCTIONS:
1.
Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for 
best operation.
2.
Water pressure should be at least 20 psi up to a maximum of 90 psi and have a minimum flow rate of
1.5 gallons per minute.
3.
Mechanical connector on brewer is ¼"male flare connector. For less than a 25 ft. run, use ¼" copper
tubing and connect to ½" or larger water line. For longer runs, use 3/8" copper tubing connected to ½" or 
larger water line and provide an adapter fitting for connection to the brewer.
4.
If installed with saddle valve, the valve should have a minimum of 1/8" port hole up to 25 ft. run,  
and 5/16" port hole for over 25 ft. run.
PRE-FILL FUNCTIONS: Main Water Tank & Heat Exchange Reservoir
1.
Main Hot Water Tank Pre-fill: When the brewer is plugged in, and the master on-off switch is
turned on, the main hot water tank will start to fill automatically. The fill process will take approximately 2
to 3 minutes to complete. Note: The function of the main hot water tank is to supply hot water to the
faucet and the Side Car only. 
2.
Upon completion of filling the main tank, power down the brewer. 
Hold
Smart Cup
**Heating**
Hold
Newco Coffee
773126  Rev 1
release
Please Insert
POD Holder
Heat Exchanger Pre-fill
1
2
1. Heat Exchanger Pre-fill: Press the
Dark button, on the faceplate, and
power up the brewer. Do not release
the Dark button until the display
scrolls to " Insert POD Holder." The
POD brewing system runs independ-
ently through a heat exchanger for its
source of hot water.