SpeakerCraft aim cinema one Guida Utente

Pagina di 8
INSTALLATION CONSIDERATIONS
Prior to the actual installation of the speakers, it will be necessary to run cables to the speaker location. See your Authorized 
SpeakerCraft Dealer for more information on cable installation. After the cable has been installed, you are ready to mount the 
speakers.
INSTALLATION PREPARATION 
New Construction
When installing the AIM CINEMA into a newly built wall, please follow these instructions carefully:
1. Determine Placement
  Determine where in the wall the speakers will be placed, using the recommendations under “PLACEMENT”. Pay careful attention 
to the section on avoiding obstructions.
2. Mount InstaLLock
 Bracket
  For best results, mount the SpeakerCraft InstaLLock
 New Construction Bracket for the AIM CINEMA following the instructions 
included with the bracket. See Figure 3.
3. The Location is Ready for Drywall
  The bracket provides a stable opening around which the drywall installer can cut out an opening, providing a perfect loca-
tion for installation of the AIM CINEMA. See Figure 4.
Figure 3
Figure 4
INSTALLATION PREPARATION 
FINISHED WALL
When installing the AIM CINEMA into a finished wall, please follow these instructions carefully:
1. Determine Placement
  Determine where in the wall the speakers will be placed, using the recommendations under “PLACEMENT”. Pay careful attention 
to the section on avoiding obstructions.
2. Locate Obstructions
  Find the studs nearest the desired speaker mounting location. The use of a good stud-finder tool is highly recommended for 
this procedure. The speakers should be centered between the two 16" on center studs. Make sure that there are no studs or 
obstructions where you plan to install the speaker. Read “Check for Obstructions” under the section “PLACEMENT”.
3. Trace Template
   Place the cutout template at the location you have decided to place the speaker. Keep in mind that the flange of the speak-
er baffle will extend beyond the cut opening by 
7
8
" in most cases. Center the template between the studs. With the template 
in place, use a level along the top or bottom edge to make sure it is even with the floor and ceiling. Use a few pieces of tape 
or small tacks to hold the template in place. See Figure 5. Trace an outline on the wall with a pencil.
2
PRINTING INSTRUCTIONS: AIM CINEMA MANUAL - INK: BLACK  (1 over 1)
MATERIAL: 80lb Gloss - SIZE: 11" x 17" folded to 8.500” x 11.000”