Supermicro gem002 Guida Utente
3-5
Chapter 3: Setup and Installation
6.
With one person on either side (see the descriptive label on the side of the
enclosure), lift the enclosure and slide it into the installed rails.
enclosure), lift the enclosure and slide it into the installed rails.
7.
After pushing the enclosure all the way into the rack, use two roundhead screws on
each side of the server to lock it into place.
each side of the server to lock it into place.
Figure 3-3. Attaching the Optional Handles
8.
The enclosure is now securely installed in the rack (see
NOTE: These handles are optional and need only be installed when mounting
the system into a short rack. When mounting into a deep rack, they are
unnecessary and regular screws should be used instead of thumbscrews.
the system into a short rack. When mounting into a deep rack, they are
unnecessary and regular screws should be used instead of thumbscrews.
Be aware that these handles are not to be used for lifting the system, they
are only to be used to slide the system within the rack.
are only to be used to slide the system within the rack.
WARNING: Be sure that the enclosure is empty of all blades, power supplies,
switches and management modules BEFORE lifting. These should be installed
AFTER the enclosure is mounted in the rack. Injury and damage may occur if
components are not removed from the rack prior to installation.
switches and management modules BEFORE lifting. These should be installed
AFTER the enclosure is mounted in the rack. Injury and damage may occur if
components are not removed from the rack prior to installation.