Mitel Deutschland GmbH 68635RFP36U-01 Manuale Utente

Pagina di 383
 
Configuration and Administration 
 
233 
7.6  STATE GRAPH OF THE START-UP PHASES 
The following figure illustrates the start-up phase for older 2
nd
 generation RFPs. 3
rd
 generation RFPs use 
a similar start-up sequence, but they start with the application phase (see below). 
wait until 
Ethernet link is up
DHCP
Check for Local 
Configuration
Inactive
active and
VLAN configured
If DHCP
offer with
VLAN code
received
Offer is valid
VLAN ID is in use
wait 6 seconds for 
OMM Configurator 
input
No OMM Configurator input
wait 60 seconds for
 OMM Configurator 
input
no offer
or offer
not ok.
after retry.
Timeout or OMM 
Configurator
input received
TFTP Download
contact Servers
from List
Server offer
Multicast TFTP
TFTP Server
list
failed
no
IGMP
join group
yes
No other
Server
available
other TFTP
Server 
configured
Download failed.
retry other 
configured servers
active but
no VLAN
configured
multiple Servers
are configured
Only one server 
is configured
contact this server
Power ON
Start
Application Phase
base station reboot
if new configuration
is received by 
OMM Configurator
TFTP Download
send read request
failed / timeout
Download failed
only one Server 
configured
If only VLAN
is configured
enable 
configured 
VLAN ID