Hardware installation for the G700 Media Gateway and S8300 Media Server
100 Installing and Upgrading the Avaya G700 Media Gateway and Avaya S8300 Media Server
 
Verifying Environmental conditions
Verify that temperatures and clearances are within the recommended technical parameters. 
Consult the table of Technical Specifications in 
!
CAUTION:
CAUTION:
Verify that temperature and clearance ranges are within tolerable limits. The 
thermal sensors may shut down equipment if it is subjected to conditions beyond 
the recommended limits. Equipment can be damaged if these restrictions are not 
respected. 
Power Verification
Check that an adequate number of power outlets are available.Verify that the G700 Media 
Gateways and the other equipment in the rack do not present a possible overcurrent or 
overload to the customer's branch circuit and/or power distribution strip. Power requirements 
are listed in 
!
WARNING:
WARNING:
Do not overload the power circuit.
Grounding Verification
Ensure that the installation site has access to approved grounds and that either a trained 
technician or a licensed electrician will be verifying all grounds and installing the Supplementary 
Ground Conductor (consult 
!
WARNING:
WARNING:
Installation in a Restricted Access Location and secure access are required in 
Finland and Norway.
The G700 Media Gateway relies on two ground connections (mains plug with an earth contact 
and a permanent Supplementary Ground Conductor). Because of unreliable earthing concerns 
in Finland and Norway, the G700 Media Gateway must be installed in a Restricted Access 
Location (RAL). An RAL is defined as an access that can be gained only by trained service 
personnel or customers who have been instructed about the reasons for the restricted access 
and any safety precautions that must be taken. In these cases, access to the G700 Media 
Gateway is gained by the use of a tool (such as a lock and key) or other means of security. 
If you have any questions about the safety conditions, contact your Project Manager. When you 
have verified that the site is ready for a safe installation, proceed with the installation.