Manuale UtenteSommarioIMPORTANT SAFETY INSTRUCTIONS – SAVE THESE INSTRUCTIONS7Specifications8AC Input Specifications8AC Bypass Input Specifications8AC Output Specifications9Battery Specifications9Recommended Cable Sizes10Connection Terminals10Torque Specifications10Fuses and Breakers11Single Utility/Mains System11Dual Utility/Mains System11Parallel System12Fuse and Breaker Sizes in Single Systems12Fuse and Breaker Sizes in Parallel Systems12Minimum Breaker Settings13Mechanical Installation14Clearance14Level the Cabinet14Remove the Front Panel15Floor Anchoring15Hole Positions for a Stand-alone UPS Enclosure with L-shaped Anc16Hole Positions for Up to Four UPS Units in Parallel with U-shape16Connect Floor Anchoring Brackets to the UPS and XR Battery Enclo17Remove the Battery Modules18Install the Baying Kit (Optional) for Interconnection of Enclosu19Install XR Battery Enclosures (Option)22Remove the Cable Landing Cover and Bottom Plates22Connect Battery Power in Installations with Busbars23Isolator Installation Principle23Install Busbars in 523 mm (20.59 in) UPS System with the UPS Pla24Install Busbars in 523 mm (20.59 in) UPS System with the UPS Pla25Install Busbars in 352 mm (13.85 in) UPS System with the UPS Pla26Install Busbars in 352 mm (13.85 in) UPS System with the UPS Pla27Connect Battery Power in Installations with Cables28Connect Power Cables Between the UPS and the XR Battery Enclosur28Connect Power Cables between Two XR Battery Enclosures29Connect the Power Cables to the UPS31Single System 10-30 kVA 208 V31Single System 10-30 kVA 480 V32Prepare for Cables33Bottom Cable Entry33Connect the AC Input and AC Output Cables34Single Mains34Dual Mains34Connect the DC Battery Cables (if applicable)35Connect the Communication Cables36Prepare for Communication Cables36Overview of Pin Connections37J10637EPO in Single Systems38EPO in Parallel Systems39Connect Communication Cables between UPS and XR Battery Enclosur40Connect APC Communication Options41Connect Communication Cables in Parallel System42Overview of the PBus Cables42Prepare for Cables43UPS Units Apart without Conduits and Interconnection44UPS Units Bayed Together without Conduits45UPS Units Apart or Bayed Together with Conduits46Install Seismic Option48Install the Seismic Battery Lock48Install the Seismic Stabilizing Brackets48Final Mechanical Installation50Connect Battery Securing Brackets for Stability50Reinstall the Top Cover and the Front Panel51Dimensioni: 6,86 MBPagine: 52Language: EnglishApri il manuale