SPX Cooling Technologies 98-1514E ユーザーズマニュアル

ページ / 32
6
Tower installation
These installation instructions are intended to help you prepare before 
your tower arrives. If discrepancies exist between these instructions
and those shipped with the tower, the instructions shipped with the 
tower will govern.
1.   Prior to placement of the tower, confirm that the supporting platform 
is level, and that the anchor bolt holes are correctly located in accor-
dance with Marley drawings. 
2.   Place tower (or bottom module of AV6300 through AV6700) on your 
prepared supports, aligning anchor bolt holes with those in your sup-
porting steel. Make sure that the orientation agrees with your intended 
piping arrangement. Attach tower to supporting steel with four 
1
2
" (13 
mm) diameter bolts and flat washers (by others). Position flat washers 
between the bolt head and the tower basin flange.
Remove the sheet metal fill protector shields from the bottom of the
top module before setting in place.
3.  
aV6300 through aV6700 models only. Remove shipping guards from 
bottom of top module (AV6500 thru AV6700). Clean any debris from 
the underside of the top module fill, skid and beams and from the top 
of the bottom module  before hoisting into place. 
Remove paper backing form sealer strips around top perimeter of
bottom module.
    Place  top  module  on  the  top  peripheral  bearing  surface  (factory-
installed gasket) of bottom module, aligning mating holes as it is set in 
place. Attach top module to bottom module with fasteners provided—
according to Field Installation Manual instructions.
If tower purchased is one cell only, ignore steps 4 through 8.
4.   If collection basins are to be equalized by the use of Marley standard 
flumes, unbolt the temporary coverplate from the basin of the cell just 
installed. The coverplate is located on the basin side.
 5.  Unbolt temporary coverplate from the basin of the 2nd cell and set 
2nd cell (or bottom module of 2nd cell) in place. Align anchor bolt 
holes and flume openings in basin sides.
 6.  Install flume according to 
Field Installation Manual instructions.
Note
Installation
Note
Note