Regency Wraps P36-NG4 ユーザーズマニュアル

ページ / 44
Regency
®
 P36-4 Gas Log Fireplace
8
152m m  Side W all
127m m
51m m
Ma
n
tel
 l
eg
Ma
n
tel
 l
eg
P36
Fireplace
Allow able m antel leg
projection.
76m
m
38m
m
INSTALLATION
Note:  40-1/2" (1029mm) is the minimum 
height for both fl ex  termination  or 
Simpson Dura-Vent fl ueing.
Note:   The  unit does not have to be 
completely enclosed in a chase. The 
clearance on top of the unit is 0" to 
the standoffs so combustible building 
materials can be laid directly on top 
of the standoffs. You must maintain 
1-1/2" (38mm) clearance from the 
fl ue to combustible materials for fl ex 
(1-1/4" for Simpson Dura-Vent ).
5)  Use steel studs for framing where the 
 
1-1/2" (38mm) clearance from the fl ue to 
combustible material cannot be maintained, 
e.g. front top header.
MANTEL LEG 
CLEARANCES
Combustible mantel leg clearances as per 
diagram below:
FRAMING AND 
FINISHING
1)  Determine the total thickness of facing 
material (e.g. drywall plus ceramic tiles) to 
allow the fi nished surface to be fl ush with 
the front of the unit. Total facing thickness 
can vary from 1/2" (13mm) to 1-1/4" (32mm) 
thick. 
Maximum 
38mm
projection 
at 51mm 
minimum 
clearance.
3)  For exterior walls, insulate the enclosure to 
the same degree as the rest of the house, 
apply vapour barrier and drywall, as per 
local installation codes. (Do not insulate 
the fi replace itself.)
4)  The top of the unit must not be closer than 
32" (813mm) to the ceiling.
2)  Frame in the enclosure for the unit with 
framing material. 
Install Side Nailing Strips, Top Facing 
Support, and Top Standoffs before 
unit is slipped into position.  See "Unit 
Assembly Prior to Installation" section 
for assembly details.
NOTE:
When using the Premium Flush Front 
option, a fi nishing trim (962mm cover) 
needs to be installed to cover the 
spacers.
Maintain a physical gap between lining 
and spacers 2-5mm. (5mm clearance to 
framing each side).
Standard Framing Dimensions
     A 
   B 
    C 
   D 
 36-1/4" 36-1/4" 12-3/4" 46"*
 921mm 921mm 324mm 1126mm*
Framing Dimensions with
Premium Flush Front Option
     A 
   B 
    C 
   D 
 37-1/4" 37-1/4" 17-3/8" 46-1/2"*
 944mm 946mm 432mm 1182mm*
* 'D' is Minimum height to combustible mate-
rials including the Minimum 2" (51mm) Top 
clearance to the Horizontal Flue, see fl ue 
clearances in section "Clearances."
Premium Flush Front Framing
Do not use combustible material as lining (eg. 
timber) around the fi replace as shown in the 
shaded area in the diagram below.