Honeywell 96D ユーザーズマニュアル

ページ / 80
M-511401
  96d User Manual 
11
8/10
Honeywell 
Introduction
Installation Instructions
Surface Mount Installation
It is recommended that controllers be installed 5 feet (1.5 m) above the 
floor, at approximate eye level.
Mark the holes as shown:
Height markers 6 13/32” apart
Width markers 10 9/16” apart
Pre-drill 1/4” mounting holes as needed
Securely mount the 96D using the appropriate screws
Wiring for the unit must be passed through the knock-outs provided at 
the bottom of the unit.
5/16
13 
1/4
16 cm
33.6 cm
1.52 m
5.0 ft