DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install and Connect Cabinets 
Page 1-17
Connect DC Power and Ground 
1
1. Install the BU3200A Battery Interface Unit (comcode 107781502) in the 
first slot of the power distribution unit. Se
NOTE:
The BIU and the rectifier modules are keyed and can only install 1 
way.
2. Install the first 2 RM0850HA100 Rectifier Modules (comcode 107793796) 
into the second and third slots of the power distribution unit. 
3. If 2 to 3 carriers are installed in the system, install a third rectifier module 
(N+1).
4. If 4 to 5 carriers are installed in the system, install a fourth rectifier module. 
5. The fifth rectifier module slot is reserved for future system growth.
Connect Power 
1. Have a qualified electrician connect and route wires from the AC load 
center to the dedicated electrical outlet for the power distribution unit.
Connect PPN Cabinet Ground
1. Connect 1 end of a 10 AWG (#25) (6 mm
2
) wire to the ground terminal 
block on the rear of the cabinet. See 
2. Route the wire to the Coupled Bonding Conductor (CBC), or to an 
approved ground, and connect.
3. Connect 1 end of a 6 AWG (#40) (16 mm
2
) CABINET GROUND wire to the 
ground terminal block at the rear of the cabinet.
4. Route the CABINET GROUND wire to the AC load center single-point 
ground block and connect.
Connect EPN Cabinet Ground(s)
1. Connect 1 end of a 6 AWG (#40) (16 mm
2
) CABINET GROUND wire to the 
ground terminal block at the bottom rear of the EPN cabinet. See 
2. Route the CABINET GROUND wire to the AC load center single-point 
ground and connect.
3. Connect each remaining EPN cabinet to the AC load center single-point 
ground.