3.5 BUS EXCEPTION CONTROL CYCLES
The bus architecture requires assertion of 
DSACK
 from an external device to signal that
a bus cycle is complete. Neither 
DSACK
 nor 
AVEC
 is asserted in the following cases:
DSACK
/
AVEC
 is programmed to respond internally.
• The external device does not respond.
• Various other application-dependent errors occur.
The MC68340 provides 
BERR
 when no device responds by asserting 
DSACK
/
AVEC
within an appropriate period of time after the MC68340 asserts 
AS
. This mechanism
allows the cycle to terminate and the MC68340 to enter exception processing for the error
condition. 
HALT
 is also used for bus exception control. This signal can be asserted by an
external device for debugging purposes to cause single bus cycle operation, or, in
combination with 
BERR
, a retry of a bus cycle in error. To properly control termination of a
bus cycle for a retry or a bus error condition, 
DSACK
BERR
, and 
HALT
 can be asserted
and negated with the rising edge of the MC68340 clock. This assures that when two
signals are asserted simultaneously, the required setup and hold time for both is met for
the same falling edge of the MC68340 clock. This or an equivalent precaution should be
designed into the external circuitry to provide these signals. Alternatively, the internal bus
monitor could be used. The acceptable bus cycle terminations for asynchronous cycles
are summarized in relation to 
DSACK
 assertion as follows (case numbers refer to Table
3-4):
• Normal Termination: 
DSACK
 is asserted; 
BERR
 and 
HALT
 remain negated (case 1).
• Halt Termination: 
HALT
 is asserted at the same time as or before 
DSACKx
, and
BERR
 remains negated (case 2).
• Bus Error Termination: 
BERR
 is asserted in lieu of, at the same time as, or before
DSACK
 (case 3) or after 
DSACK
 (case 4), and 
HALT
 remains negated; 
BERR
 is
negated at the same time as or after 
DSACK
.
• Retry Termination: 
HALT
 and 
BERR
 are asserted in lieu of, at the same time as, or
before 
DSACK
 (case 5) or after 
DSACK
 (case 6); 
BERR
 is negated at the same
time as or after 
DSACK
, and 
HALT
 may be negated at the same time as or after
BERR
.
Table 3-4 lists various combinations of control signal sequences and the resulting bus
cycle terminations. To ensure predictable operation, 
BERR
 and 
HALT
 should be negated
according to the specifications given in Section 11 Electrical Characteristics
DSACK
BERR
, and 
HALT
 may be negated after 
AS
. If 
DSACK
 or 
BERR
 remain asserted into S2
of the next bus cycle, that cycle may be terminated prematurely.
EXAMPLE A: A system uses a bus monitor timer to terminate accesses to an unpopulated
address space. The timer asserts 
BERR
 after timeout (case 3).
 
   
  
F
re
e
sc
a
le
 S
e
m
ic
o
n
d
u
c
to
r,
 I
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
 
Freescale Semiconductor, Inc.
For More Information On This Product,
   Go to: www.freescale.com
n
c
.
..