Mitsubishi Electronics 13JW55 ユーザーズマニュアル

ページ / 350
 
 
App. - 80
 
 
 
Appendix 9.2.8    Writing sequence programs 
For the procedure to write sequence programs, refer to section 2.7 (1) "Writing data 
to the CPU". 
 
Appendix 9.2.9  Operation check 
For the procedure to check the operation of the created program, refer to section 2.8 
Monitoring Ladder Program Status. 
 
Turn on the switch (X2) and confirm that the analog value is read. 
Turn on the switch 
(X10).
The current analog 
value is displayed.
 
Double-clicking the FB in the sequence program on the screen enables monitoring 
of the sequence program status in the FB. 
 
 
SH-081123ENG-A