Mitsumi electronic NZ2GF-ETB ユーザーズマニュアル

ページ / 246
109
CHAPTER 7 COMMUNICATION OF THE ETHERNET ADAPTER MODULE
7
7.3  IP C
ommunications over
 CC-
Link IE F
ield Netw
ork (IP Packet 
Tran
sfer
 Function)
7.3.4  C
onnection
 to CC-
Link IE Field Netwo
rk
7.3.4
Connection to CC-Link IE Field Network
Set the parameters in the master station for IP communications over CC-Link IE Field Network.
(1) Setting in the master station
Use GX Works2 to set the parameters in the master station. Use the default settings for the parameters other than 
those set below.
1.
Create a project on GX Works2.
[Project]  
[New...]
2.
Open the "Network Parameter" setting window to set the parameters as follows.
Project window 
 [Parameter] 
 [Network Parameter]  
[Ethernet/CC 
IE/MELSECNET]
Setting