Multi-Tech Systems 7500 ユーザーズマニュアル

ページ / 372
Retrofit Options
 ION 7500 / ION 7600 User’s Guide
Page 176
Chapter 6 - Hardware Reference 
Retrofit Options
Terminal Cover
Installation Instructions
1.
Turn off all power to the meter.
2.
Open all PT fuses (or direct voltage input fuses). Close all CT shorting blocks.
3.
Ensure that all cables connected to the meter (including those at to the I/O 
terminals) are NOT live.
4.
For each cover, insert two tabs into the small rectangular openings at either end 
of the strip (refer to the diagram below).
5.
Optional: you can tamper-proof each terminal strip by inserting a sealing wire 
or tag through the holes at the end of the tabs.
6.
Close the PT fuses (or direct voltage input fuses), and open the CT shorting 
blocks. 
7.
Turn on power to the meter and verify the correct operation of the unit.
Installation Diagram
Opening where top of tab 
will stick through.
Tab (one of four)
Terminal cover for relay 
and digital inputs
One of four rectangular 
openings
Tamper proofing holes – 
insert a sealing wire or tag 
through these two holes 
(sizes: 0.125” & 0.050”)
Terminal cover 
for voltage and 
current inputs