Mitsubishi Electronics A1SJ71AT23BQ ユーザーズマニュアル

ページ / 158
5
PREPARATORY PROCEDURES BEFORE 
OPERATION
5.5 Self-diagnostic Test
5.5.2 Station-to-station test
5
 - 16
1
O
V
ER
VI
E
W
2
S
YST
EM
 
CONF
IGURA
T
ION
3
S
P
E
C
IF
ICA
T
IONS
4
F
UNCT
IO
NS
5
PR
EP
ARA
T
O
R
Y
 
PR
O
C
E
DURES
 BEF
ORE 
OP
E
R
A
T
ION
6
L
INK DA
TA
 SEN
D/ 
RE
C
E
IV
E
 P
R
OCE
S
S
ING 
A
N
D
 P
R
OCE
S
S
ING 
T
IME
7
P
R
OGRA
M
MING
8
TR
O
U
BL
ESHO
O
T
IN
G
5.5.2
Station-to-station test
The station-to-station test checks a line between two adjacent stations.
A test is performed to a line between two stations assuming that the station which has the 
small station No. is the executing station and the other is the other station.
The line is judged by whether the data sent from the executing station can be sent from the 
other station in a given time.
(1) System configuration
(a) MELSECNET(A1SJ71AP23Q)
An optical fiber cable connects OUT of the executing station and IN of the other 
station.
(b) MELSECNET(A1SJ71AR23Q)
A coaxial cable connects OUT of the executing station and IN of the other station.
Figure 5.18 MELSECNET(A1SJ71AP23Q)
Figure 5.19 MELSECNET(A1SJ71AR23Q)
Executing station
No.n
Other station
No.n+1
OUT
IN
Front
Front
OUT
IN
Data flow of
forward loop
Data flow of reverse loop
Optical fiber cable
Station
No.01
Station
No.02
Front
Front
R-RD
F-SD
F-RD
R-SD
IN
OUT
R-RD
F-SD
F-RD
R-SD
IN
OUT
Coaxial cable
Executing station No.n
Other station No.n+1
Data flow of
reverse loop
Data flow of
forward loop
Station No.01
Station No.02