Mitsubishi Electronics QD75MH2 ユーザーズマニュアル

ページ / 838
 
 
 
10 - 23 
MELSEC-Q
 
10   HIGH-LEVEL POSITIONING CONTROL 
 
10.6 Start program for high-level positioning control 
10.6.1 Starting high-level positioning control 
To execute high-level positioning control, a PLC program must be created to start the 
control in the same method as for major positioning control.  
 
The following shows the procedure for starting the "1st point block start data" 
(regarded as block No. 7000) set in axis 1. 
 
1500
Y10
1501
PLC CPU
7000
1
ON
QD75MH
Input/output signal 
 
Servo amplifier
 
Buffer memory  
Control by designated
positioning data
 
 
   When carrying out a positioning start with the
   next scan after a positioning operation is 
   completed, input signal X10 as an interlock so
   that the start is carried out once the X10 signal
   turns OFF after the Y10 signal turns OFF. 
 
1)
3)
2)
4)
1) Set "7000" in " Cd. 3 Positioning start No.".
    (This establishes that the control as "high-level positioning control" using block start data.)
2) Set the point No. of the "block start data" to be started. (In this case "1".)
3) Turn ON the start signal.
4) The positioning data set in the "1st point block start data" is started. 
                                                                                                                               
 
Fig. 10.2 High-level positioning control start procedure