Mitsubishi Electronics A0567659 ユーザーズマニュアル

ページ / 96
 
Gravimetric Batch Blenders w/Mitsubishi Control   Chapter 5: Maintenance 
67 
Chapter 
5: 
Maintenance 
      
5-1  Preventative Maintenance Schedule 
The mechanical design of the blender is very simple and very little maintenance is required.  
The only moving parts are the metering gates, weigh hopper dump valve and mixer agitator. 
The checklist below contains a list of items which should be inspected and/or replaced to 
keep your blender operating at peak efficiency.  Perform each inspection at the regular 
intervals listed below. 
System model # 
 
Serial # 
Daily 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect blender for 
any loose parts-
tighten them 
immediately. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify quality of 
compressed air 
supply. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify mixer door is 
properly latched. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect metering 
gates for proper 
operation. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Check to make 
sure that all hose  
connections are 
air tight.         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month  Jan  Feb  Mar  Apr  May Jun
Jul  Aug Sep  Oct  Nov Dec
Inspect air 
regulator and air 
safety circuits, if 
equipped. 
 
 
 
 
 
 
 
 
 
 
 
 
Recalibrate blender 
only If necessary. 
 
 
 
 
 
 
 
 
 
 
 
 
 
- Photocopy this page for your maintenance records -