Mitsubishi Electronics sw1dnd-iqwk-e ユーザーズマニュアル
3 - 53
1
OV
E
R
VI
EW
2
SCREEN
CO
N
F
IG
UR
A
T
IO
N
3
OPE
RA
TI
NG
PROCEDURE
OF
M
ELSOFT
NA
VI
GA
TO
R
4
USI
N
G SYSTE
M
LAB
E
LS
5
CREA
T
ING
S
YSTEM
B
A
CK
U
P
DA
TA
6
USI
N
G PROG
RAM
JUMP F
UNCTION
3.9 Reading/Writing/Verifying Controller Data
3.9
Reading/Writing/Verifying Controller Data
This section explains a method for reading/writing/verifying project data (programmable controller project,
motion controller project, GOT project).
motion controller project, GOT project).
■ Programmable controller projects
Read/write/verify programmable controller project data.
1.
On the System Configuration window,
right-click the controller to which a
programmable controller project is
allocated, and select [Online]
right-click the controller to which a
programmable controller project is
allocated, and select [Online]
⇒
[Read]/[Write]/[Verify] in the shortcut
menu.
menu.
The screen image on the left shows the
case when [Write] is selected. Perform the
same operation for [Read] and [Verify].
case when [Write] is selected. Perform the
same operation for [Read] and [Verify].
2.
The "Online Data Operation" dialog box
is displayed.
is displayed.
For operating the
"
Online Data Operation
"
dialog box, refer to the following manuals.
GX Works2 Version 1 Operating
Manual (Common)
Manual (Common)
GX Works2 Version 1 Operating
Manual (Simple Project)
Manual (Simple Project)
GX Works2 Version 1 Operating
Manual (Structured Project)
Manual (Structured Project)
GX Works2 Beginner's Manual
(Simple Project)
(Simple Project)
GX Works2 Beginner's Manual
(Structured Project)
(Structured Project)
Select