Mitsubishi Electronics sw1dnd-iqwk-e ユーザーズマニュアル

ページ / 124
3 - 53
OV
E
R
VI
EW
2
SCREEN 
CO
N
F
IG
UR
A
T
IO
N
3
OPE
RA
TI
NG
 PROCEDURE 
OF
 M
ELSOFT
 NA
VI
GA
TO
R
4
USI
N
G SYSTE
M
 
LAB
E
LS
5
CREA
T
ING
 S
YSTEM 
B
A
CK
U
P
 DA
TA
6
USI
N
G PROG
RAM 
JUMP F
UNCTION
3.9 Reading/Writing/Verifying Controller Data
3.9
Reading/Writing/Verifying Controller Data
This section explains a method for reading/writing/verifying project data (programmable controller project, 
motion controller project, GOT project).
■ Programmable controller projects
Read/write/verify programmable controller project data.
1.
On the System Configuration window, 
right-click the controller to which a 
programmable controller project is 
allocated, and select [Online]
 ⇒ 
[Read]/[Write]/[Verify] in the shortcut 
menu.
The screen image on the left shows the 
case when [Write] is selected. Perform the 
same operation for [Read] and [Verify].
2.
The "Online Data Operation" dialog box 
is displayed.
For operating the
 "
Online Data Operation
"
 
dialog box, refer to the following manuals.
GX Works2 Version 1 Operating 
Manual (Common)
GX Works2 Version 1 Operating 
Manual (Simple Project)
GX Works2 Version 1 Operating 
Manual (Structured Project)
GX Works2 Beginner's Manual 
(Simple Project)
GX Works2 Beginner's Manual 
(Structured Project)
Select