Intel Pentium M 730 RH80536GE0252M ユーザーズマニュアル
製品コード
RH80536GE0252M
Electrical Specifications
40
Mobile Intel
Pentium
4 Processor-M Datasheet
.
NOTES:
1. Input signals other than RESET# must be held constant in the Sleep state.
2. The BCLK can be stopped after DPSLP# is asserted. The BCLK must be turned on and within specification
2. The BCLK can be stopped after DPSLP# is asserted. The BCLK must be turned on and within specification
before DPSLP# is deasserted.
.
2.14
Processor AC Timing Waveforms
The following figures are used in conjunction with the AC timing tables,
For
through
, the following apply:
NOTES:
1. All common clock AC timings for AGTL+ signals are referenced to the Crossing Voltage (V
CROSS
) of the
BCLK[1:0] at rising edge of BCLK0. All common clock AGTL+ signal timings are referenced at GTLREF at the
processor core.
processor core.
2. All source synchronous AC timings for AGTL+ signals are referenced to their associated strobe (address or
data) at GTLREF. Source synchronous data signals are referenced to the falling edge of their associated data
strobe. Source synchronous address signals are referenced to the rising and falling edge of their associated
address strobe. All source synchronous AGTL+ signal timings are referenced at GTLREF at the processor
core silicon.
strobe. Source synchronous address signals are referenced to the rising and falling edge of their associated
address strobe. All source synchronous AGTL+ signal timings are referenced at GTLREF at the processor
core silicon.
3. All AC timings for AGTL+ strobe signals are referenced to BCLK[1:0] at V
CROSS
. All AGTL+ strobe signal
timings are referenced at GTLREF at the processor core silicon.
4. All AC timings for the TAP signals are referenced to the TCK signal at 0.5*V
CC
at the processor pins. All TAP
signal timings (TMS, TDI, etc.) are referenced at 0.5*V
CC
at the processor pins.
The circuit used to test the AC specifications is shown in
Table 26. Stop Grant/Sleep/Deep Sleep/Enhanced Intel SpeedStep Technology AC
Specifications
T# Parameter
Min
Max
Unit
Figure
Notes
T70: SLP# Signal Hold Time from Stop Grant
Cycle Completion
Cycle Completion
100
BCLKs
T71: Input Signals Stable to SLP# Assertion
10
BCLKs
1
T72: SLP# to DPSLP# Assertion
10
BCLKs
T73: Deep Sleep PLL Lock Latency
0
30
µ
s
2
T74: SLP# Hold Time from PLL Lock
0
ns
T75: STPCLK# Hold Time from SLP#
Deassertion
Deassertion
10
BCLKs
T76: Input Signal Hold Time from SLP#
Deassertion
Deassertion
10
BCLKs
T77: VID[4:0] Output Valid Delay from DPSLP#
Assertion
0
10
µ
s