Motorola BT100 ユーザーズマニュアル

ページ / 52
  
Amplifier 
Setup 
3-11 
 
BT100 Installation and Operation Manual 
Position the drive control select jumper to 
AUTO
Connect a signal-level meter to the 
FWD OUT
 test point and tune the meter to the high 
band-edge carrier. 
Turn the thermal level potentiometer on the TDU fully clockwise and then reduce to obtain 
the level obtained in Step 9 under Manual Gain Control. 
Automatic Drive Unit/QAM Automatic Drive Unit 
The ADU and QADU operate by using surface acoustic wave (SAW) filters to select a pilot 
frequency and then monitoring the amplitude of this frequency. Any change in signal level is fed 
back to the Bode equalizer. It is assumed that the encountered signal level changes are due to 
changes in cable attenuation and hybrid output associated with a change in temperature. The 
Bode equalizer then changes its insertion loss to maintain a constant output level. The ADU 
(illustrated in Figure 3-6) and QADU (Figure 3-7) maintain a more precise output level than 
using the TDU or leaving the BT100 in manual control. 
Figure 3-6  
ADU 
 
 
Figure 3-7  
QADU 
 
 
To set-up the ADU/QADU: 
Position the drive control select jumper (Figure 2-13) temporarily to the 
MAN
 position and 
perform the complete procedure described in Manual Gain Control if not already completed.