Mitsubishi Electronics Mitsubishi Digital Electronics Water System SW1DNC-GXW2-E ユーザーズマニュアル

ページ / 110
3.4.1 Monitoring a program
3 - 29
1
OV
E
R
VI
EW
2
CRE
A
T
E
D
 PROGRAM 
AN
D SYS
TEM 
CONF
IGURA
TION
3
CR
EA
TI
NG PR
O
G
R
A
M
 IN
 
S
TRUC
TUR
E
D
 L
A
DDE
R/
FB
D
 LA
NG
UA
G
E
4
CREA
T
ING 
PROG
RAM IN ST 
LANGUAGE
5
CRE
A
TI
NG T
W
O OR 
MORE PROGRAM 
BLO
C
K
S
3.4 Monitoring Operations
3.4
Monitoring Operations
Execute "Monitor" to check the operations.  
In some monitor screen display examples, colors are changed for the convenience of printing.
GX Works2 has the function to simulate programmable controller operations in the offline mode.  
Refer to the following manual for the simulation function:
GX Works2 Version 1 Operating Manual (Common)
3.4.1
Monitoring a program
1.
Click "Project" in the view selection area on the 
Navigation window to display the Project view.
2.
Double-click "POU" 
 "Program" 
 
"POU_01" 
 "Program" on the Project view to 
display the POU_01 [PRG] Program [Structured 
Ladder/FBD] screen.
3.
Select [Online]
 
 [Monitor]
 
 [Start 
Monitoring] to switch the POU_01 [PRG] 
Program [Structured Ladder/FBD] screen to the 
monitoring status.
You can also click 
 (Start Monitoring) to switch
the POU_01 [PRG] Program [Structured Ladder/
FBD] screen to the monitoring status.
4.
Set the programmable controller CPU to RUN. 
Set the RUN/STOP switch on the 
programmable controller CPU to "RUN".
Click it.
Double-click it.
(To the next page)