Motorola Automobile Accessories F5218 ユーザーズマニュアル

ページ / 82
6
MW810 Mobile Workstation Vehicle Installation Manual
• To cool the MW810 Mobile Workstation, allow sufficient space around the CPU Box for 
free air flow.
• Select a location for the CPU Box that permits routing the RF antenna cable as directly as 
possible.
• If you are mounting the display on a plastic dashboard, you must first reinforce the 
dashboard; otherwise the weight of the display may crack or break the dashboard.
• Do not mount the CPU Box on a flat or concave surface where the unit could become 
partially submersed in water.
Air Bag Considerations
When planning the installation of communication equipment in a vehicle with one or more 
air bags, proceed as follows:
• Installation of vehicle equipment should be performed by a professional installer/
technician qualified in the requirements for such installations. An air bag’s size, shape and 
deployment area can vary depending on vehicle make, model and front compartment 
configuration (e.g., bench seat vs. bucket seats).
• Contact the vehicle manufacturer’s corporate headquarters, if necessary, for specific air 
bag information for the vehicle make, model and front compartment configuration 
involved in your equipment installation.