MgX SerieS • operaTion and parTS Manual — rev. #0 (03/26/12) — page 15
OperatiOn
operaTion
1.  Connect the vibrator to the proper power source.
2.  If an extension cord is necessary, refer to Table 5 for 
the correct type of extension cord to use.
3.  Hold vibrator head above concrete pour when starting 
drive motor. This will prevent the vibrator head from 
bouncing on hard surfaces which could damage the 
bearings.
4.  Push  the  ON/OFF  switch  to  the  ON  position  then 
immerse into the surface. Do not run the motor outside 
of the surface for long periods.
5.  Keep flexshaft (Figure 5) straight as possible when 
operating. Sharp bends increase the load on the core 
and drive motor, which will result in early core failure 
and possible damage to the drive motor.
Figure 5. Vibrator Head Insertion
Table 5. extension Cord Types
Current 
in 
amperes 
load in Watts
Maximum allowable Cable length
at 100 
volts
at 200 
volts
#10 Wire #12 Wire #14 Wire #16 Wire
2.5
300
600
1000 ft.
600 ft.
375 ft.
250 ft.
5
600
1200
500 ft.
300 ft.
200 ft.
125 ft.
7.5
900
1800
350 ft.
200 ft.
125 ft.
100 ft.
10
1200
2400
250 ft.
150 ft.
100 ft.
15
1800
3600
150 ft.
100 ft.
65 ft.
20
2400
4800
125 ft.
75 ft.
50 ft.
 NOTICE
Pressing the Power Lock Button will lock the On/OFF 
switch to the ON position.
1-1/2 TIMES AREA
OF INFLUENCE
CORRECT
INCORRECT
FLEX-SHAFT
VIBRATOR HEAD
VIBRATOR HEAD
6.  Completely  immerse  the  vibrator  head  quickly  into 
the concrete mix at a verticle rate of about one foot 
per second (0.3 meters/second). Vibrate concrete for 
about 5 to 15 seconds for wet mixes. For stiff mixes 
vibrate 2-3 minutes.
7.  Stop vibration of concrete mix when concrete has a 
level,  glossy  surface  and  there  are  no  breaking  air 
bubbles.
8.  Slowly lift the head out of the mix using an up and 
down movement. This slight up and down movement 
will close the hole formed by the vibrator.
9.  When lifting the head out of the concrete, withdraw 
slowly at a rate of about 3 sec./ft. Using this technique 
will avoid the re-trapping of air.
10.  When near the top of the mix, withdraw the vibrator 
quickly.
11.  Re-insert  vibrator  into  mix  according  to  the  "area 
of influence" See Figure 5. Establish a symmertical 
overlapping  pattern  for  inserting  and  removing  the 
vibrator head.
12.  If concrete is poured in layers, allow vibrator to pass 
within 3 to 6 inches (76 to 152 mm.) into next layer to 
ensure  the  knitting  of  the  two  layers. The  complete 
bonding of layers will prevent "lift lines" when forms 
are removed.
 NOTICE
do noT use vibrator to move concrete laterally. This 
will cause segregation of the concrete. Use a shovel 
or similar device to spread the concrete.