Mitsubishi Electronics AJ61BT11 ユーザーズマニュアル

ページ / 294
 
 
 
12 - 14 
MELSEC-QnA 
12   COMMUNICATION IN THE COMPOUND SYSTEM 
 
12.3 Performing the Data Link 
Turn on the power supply of the remote I/O station/remote device station/local station 
first, then the power supply of the master station to start the data link. 
 
12.3.1 Confirming the operation by LED display 
The following diagram shows the LED display status of the master station, the remote 
I/O station, the remote device station, and the local station when the data link is 
performed normally. 
 
(1)   LED display of the master station 
Confirm that the LED display shows the following status: 
 
A
J61QBT11
RUN
156K
ERR.
625K
MST
2.5M
S MST
5M
LOCAL
10M
CPU R/W
SW
M/S
TEST
PRM
S0
TIME
S1
LINE
S2
L RUN
SD
L ERR.
RD
B
R
A
T
E
T
E
S
T
E
R
R
O
R
The transmission speed is set to 2.5Mbps.
Sending data.
Receiving data.
Module is normal.
Set as a master station.
Communicating with programmable
controller CPU.
The data link is proceeding normally.
 
 
(2)   LED display of the remote I/O station 
Confirm that the LED display shows the following status: 
 
PW
L RUN
SD
RD
L ERR.
A
J65BTB1-16DT
The data link is proceeding normally.
Sending data.
Receiving data.
24VDC is supplied.