BUILDER'S CHOICE SERIES INSTALLATION INSTRUCTIONS
c. Firestop Spacer/Chimney Installation
Frame  an  opening  and  install  an  FS6  Firestop
Spacer whenever the vent penetrates a ceiling/
floor  area,  as  shown  in  Figure  16.  Frame  the
opening with the same sized lumber as used in
the  ceiling/floor  joists.  Do  not  pack  insulation
around the chimney.
d. Chase/Termination Installation
Figures 17 and 18, and Table 1 specify minimum
chimney heights for various pitched roofs.
These  chimney  heights  are  necessary  for  safety
and  do  not  ensure  draft-free  operation.  Trees,
buildings, adjoining roof lines, adverse conditions,
etc. may create a need for a taller chimney should
down drafting occur.
Figure 16
Installing the Firestop Spacer
Figure 17
Chimney Height for Vertical Termination
Roof Pitch
H (Min.) Ft.
Flat to 6/12
1.0
6/12 to 7/12
1.25
Over 7/12 to 8/12
1.5
Over 8/12 to 9/12
2.0
Over 9/12 to 10/12
2.5
Over 10/12 to 11/12
3.25
Over 11/12 to 12/12
4.0
Over 12/12 to 14/12
5.0
Over 14/12 to 16/12
6.0
Over 16/12 to 18/12
7.0
Over 18/12 to 20/12
7.5
Over 20/12 to 21/12
8.0
Table 1
Chimney Height
Note: 
To ensure proper operation, verify all venting and
the  termination  are  unobstructed.
Figure 18
Multiple Vertical Termination Clearances