PVI Industries PV500-25 사용자 설명서

다운로드
페이지 11
QUICKDRAW
®
 Steam Heater  
 
10 
 
CAUTION: When cleaning a tube bundle, tubes should not be hammered on with any metallic 
tool and, in case it is necessary to use scrapers, care should be exercised that the scraper is 
not sharp enough to cut the metal of the tubes. 
 
 
 
4.  When replacing the heat exchanger head, use a torque wrench to tighten the bolts/studs and nuts. 
Use the following chart as a guide. All torque values apply to well-lubricated nut bearing surfaces. 
 
TIGHTENING TORQUES 
 
COMPRESSED FIBER GASKETS 
 
Bolt 
Dia. 
Recommended 
Torque 
ft-lbs 
 
Torque 
Increment 
 
Max. 
Torque 
1/2" 40 
60 
5/8" 80 
5  120 
 
 
SPIRAL WOUND GASKETS 
 
Bolt/Stud 
Dia. 
Recommended 
Torque 
ft-lbs 
 
Torque 
Increment 
 
Max. 
Torque 
1/2" 40 
60 
5/8" 80 
5  120 
3/4" 120 
200 
7/8" 200 
10  320 
1" 300  10  490 
1 1/8" 
450 
10 
710 
1 1/4" 
600 
10 
1000