4. How Auto Test Works
Creating the Cable Test Schedule in Plan-Um, uploading it to the 
Validator, and running Auto Test is the easiest and most efficient way 
to verify cables.  See the Uploading/Downloading Jobs section of this 
manual (or the Plan-Um Software Instructions) for detailed instructions 
on how to upload and download job information and test results between 
Plan-Um and the Validator. 
When you have uploaded a job from Plan-Um to the Validator-NT main 
unit, the job will appear in the list on the 
Job Manager screen.  To run an 
existing job, you must first open it from the Job Manager before using it 
with Auto Test. 
When you open a job, the Auto Test screen appears.  This screen gives 
you five options:  
Cable Test Schedule, Site Information, Contractor 
Information, Custom Cable Definitions and Job Utilities. See Figure 
4.1 for a Flowchart of the Auto Test process.
 