HotSwap MBP-module operation
UPS start-up with the HotSwap MBP module
1 - Check that the UPS is correctly connected to the HotSwap MBP module.
2 - Set switch (53) to the Normal position.
3 - Start the UPS by pressing the ON/OFF button (27) on the UPS control panel.
The load is supplied by the UPS.
LED (51) "UPS ON - OK to switch" on the HotSwap MBP module goes ON.
2 - Set switch (53) to the Normal position.
3 - Start the UPS by pressing the ON/OFF button (27) on the UPS control panel.
The load is supplied by the UPS.
LED (51) "UPS ON - OK to switch" on the HotSwap MBP module goes ON.
HotSwap MBP-module test
1 - Set switch (53) to the Bypass position and check that the load is still supplied.
2 - Set switch (53) back to the Normal position.
2 - Set switch (53) back to the Normal position.
2.7 UPS connection without a FlexPDU or HotSwap MBP module
The
HotSwap MBP module has a rotary
switch (53) with two positions:
Normal - the load is supplied by the UPS,
Bypass - the load is supplied directly by the
AC-power source.
Normal - the load is supplied by the UPS,
Bypass - the load is supplied directly by the
AC-power source.
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source and
the true electrical consumption of the total load.
the true electrical consumption of the total load.
1 - Connect the supplied cable (31) (250 V -
16 A) to the socket (10), then to the AC-power
source.
2 - Connect the loads to the UPS using the
cables (32).
It is preferable to connect the priority loads to
the four outlets marked (9) and the non-
priority loads to the four outlets marked (8)
that can be programmed in pairs (1 and 2).
Connect any high-power devices to the 16 A
outlet (7).
16 A) to the socket (10), then to the AC-power
source.
2 - Connect the loads to the UPS using the
cables (32).
It is preferable to connect the priority loads to
the four outlets marked (9) and the non-
priority loads to the four outlets marked (8)
that can be programmed in pairs (1 and 2).
Connect any high-power devices to the 16 A
outlet (7).
To program shutdown of outlets (8) during
operation on battery power and thus optimise
the available backup time, the MGE UPS
SYSTEMS communications software is
required.
operation on battery power and thus optimise
the available backup time, the MGE UPS
SYSTEMS communications software is
required.
3 - Fit the connection securing system (35)
that prevents the plugs from being pulled out
accidentally.
that prevents the plugs from being pulled out
accidentally.
Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (27) is not pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can
supply the rated backup time.
By-p
ass
Normal
UPS ON - OK to switch
BY
P
ASS SWITCH
51
52
53
10
8
9
31
32
35
7