Enterasys Networks 4G4282-49 사용자 설명서

다운로드
페이지 90
Installing the DFE Module into a Chassis
Matrix DFE-Gold Series Installation Guide 3-11
Installing the DFE Module into a Chassis
To install a DFE‐Gold module into a chassis, proceed directly to 
page 3‐11 to start the installation process.
Preparation
1.
Remove the blank panel covering the slot in which the module will be installed. All 
other slots must remain covered to ensure proper airflow for cooling. (Save the blank 
plate in the event you need to remove the module.)
2.
Remove the module from the shipping box. (Save the box and packing materials in 
the event the module needs to be reshipped.)
3.
Locate the antistatic wrist strap shipped with the chassis. Attach the antistatic wrist 
strap to your wrist and plug the cable from the antistatic wrist strap into the ESD 
grounding receptacle at the upper right corner of the chassis.
4.
Remove the module from the plastic bag. (Save the bag in the event the module must 
be reshipped.) Observe all precautions to prevent damage from Electrostatic 
Discharge (ESD).
5.
Examine the module for damage. If any damage exists, DO NOT install the module. 
Immediately contact Enterasys Networks. Refer to 
Caution: Failure to observe static safety precautions could cause damage to the 
DFE module. Follow static safety handling rules and wear the antistatic wrist strap.
Do not cut the non-conductive bag to remove the module. Sharp objects contacting the 
board or components can cause damage.
Precaución: Si no toma las medidas de seguridad necesarias para evitar descargas de 
electricidad estática, es posible que el módulo se dañe. Siga los consejos de seguridad 
para la manipulación del producto y no olvide utilizar la pulsera antiestática.
No corte la bolsa antiestática para sacar el módulo. Tenga en cuenta que si algún objeto 
cortante entra en contacto con la placa o con los componentes, éstos podrían dañarse.