Fujitsu RX600 S5 사용자 설명서
RX600 S5
Operating Manual
51
Hardware installation
Rack installation/removal of server
V
CAUTION!
Ensure that the safety lock has been inserted before the server is
inserted (see
inserted (see
V
CAUTION!
At least two people are needed to position the server in the rack.
(For the Japanese market, please refer to "
(For the Japanese market, please refer to "
安全上の注意およびその他の
重要情報
".)
Ê
Extend the telescopic rails completely to the front (1).
I
They must click into place so that they can no longer be moved.
Ê
Lower the server from above onto the projecting telescopic rails (2), (3). As
you do this, the locking bar (4) engages.
you do this, the locking bar (4) engages.
Ê
Push the locking mechanism of both telescopic rails up (5).
Ê
Push the server as far as it will go into the rack (6).
Ê
Fasten the server to the rack (7) using the two knurled screws (front panel).
Torque: 0.25 Nm
Torque: 0.25 Nm
Ê
Route the cables as described in the Technical Manual for the rack in
question with the server pushed in.
question with the server pushed in.
4.2.3
Installation in 3rd party racks
I
The support systems from Fujitsu are suitable for use in any 3rd party
racks for standard servers (installation depth 714 - 785 mm) without
restrictions.
racks for standard servers (installation depth 714 - 785 mm) without
restrictions.
Ê
Refer to the manual from the rack manufacturer for details of the mechanical
installation and the climatic conditions.
installation and the climatic conditions.
V
CAUTION!
When installing in 3rd party racks, it must be ensured that an air flow
from the front to the back of the rack is guaranteed.
from the front to the back of the rack is guaranteed.
Ê
Fit the required original parts (support bracket or cable management
system).
system).