Rolls Royce 1004227 사용자 설명서

다운로드
페이지 82
EPRI Proprietary Licensed Material 
 
RB 211 Maintenance Scope 
B-6 
Rebuild the Module to the Rolls-Royce overhaul specification, fits and clearances etc. and ship 
back to the Customer or replace in the ‘POOL’. 
05 Module: 
•  Carry out dimension check of IPT Rotor setting. 
•  Inspect the IP Turbine Casing Assembly in the Bulk Condition, including Seal Segments, IP 
NGV’s, HP and IP Roller Bearings and Static Abradable Seals. 
•  Inspect the IP Turbine Rotor Assembly in the Bulk condition.  Check wear on IP 
•  Turbine blade ‘Z’ notch, turbine disc, shaft, coupling and IPT bearing. 
•  Insure no ‘coking’ in oil scavenge or vent lines in the ‘spider’. 
•  Carry out the following Repair Notes and Overhaul Information Alerts: 
−  RN5018 
HP/IP support internal pipe inspection/test 
−  RN5037 
IP Turbine Blade inspection criteria 
•  Embody the following modifications: 
−  Mod 1123 Revised vent connection, if required 
06 Module: 
•  Visually Inspect all accessories, including Air and Oil Piping, Nose Bullet and P2 Air Filter. 
•  Electrically check Thermocouple Harness. 
•  Remove HP and IP Bleed Valves and Overhaul. 
•  Replace Seals in Davis Valve. 
Rebuild 
Using the Customers spare 04 Module, rebuild the engine to the Rolls-Royce Overhaul build 
specification and fits/clearance limits.