Flue Manifold Installation   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1.  Disassemble the Flue Manifold  
The flue consists of 3 parts:  
•  sleeve 
•  inside connection 
•  terminal 
Disassemble the flue manifold by first pulling 
out the inside connection.  To remove the 
outer terminal pull and release the two 
internal ties and then pull out the outer 
terminal.    
Clearance to combustibles for the sleeve and 
flanges is zero inches. 
Drilling 
Flue 
and 
Gas 
Supply 
Holes              
Check for water and gas pipes as well as electric 
cables.  Use the template supplied to mark the wall 
locations for the flue manifold and the gas supply.  
Drill the flue hole using a 3 1/2 inch (90 mm) drill.   
For weatherboard walls, drill through the center of the 
weatherboard from the outside first and then through 
the plasterboard.   
Inside Connection 
Sleeve 
Terminal 
  Venting 
    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
There are 2 categories for venting: 
I.  Venting with Flue Manifolds FOT-203 or FOT-204 - horizontal venting directly through the wall with no 
extensions. 
II.  Extended Venting - horizontal and vertical terminations with a maximum 33 feet and 3 elbows. 
I. 
Venting with Flue Manifolds FOT-203 and FOT-204 
The following flue manifold sizes are available: 
Name Kit 
No. fits 
walls 
Vent Kit A 
FOT-203 
4 1/3 - 9 1/2 inch 
(110 - 240 mm) 
Vent Kit B 
FOT-204 
9 1/2 - 15 3/4 inch 
(240 - 400 mm) 
FOT-203 / 
FOT-204 
Flue extensions are not authorized to be used with 
the FOT-203 and FOT-204 manifolds.