Roberts Gorden 250 Manual Do Utilizador

Página de 62
SECTION 13: S
ERVICING
33 of 51
13.7 Venting and Air Intake Pipe
Inspect all venting and air intake pipe. Ensure that 
all seams are sealed and suspension points secure. 
Repair suspension points if any part of the venting 
or combustion air pipe is sagging. Check to make 
sure any insulation is not missing or in poor 
condition. Replace as necessary. Check all venting 
and air intake components to ensure they are in 
good condition, gas tight and corrosion-free.
13.8 Maintenance Checklist
Installation Code and Annual Inspections: All 
installations and service of ROBERTS GORDON
®
  
equipment must be performed by a contractor 
qualified in the installation and service equipment 
sold and supplied by Roberts-Gordon LLC and 
conform to all requirements set forth in the 
ROBERTS GORDON
®
  manuals and all applicable 
governmental authorities pertaining to the 
installation, service, operation and labeling of the 
equipment.
To help facilitate optimum performance and safety, 
Roberts-Gordon LLC recommends that a qualified 
contractor conduct, at a minimum, annual 
inspections of your ROBERTS GORDON
®
 
equipment and perform service where necessary, 
using only replacement parts sold and supplied by 
Roberts-Gordon LLC.
Annual Fall Start-Up
Follow entire start-up procedure at this time and check control settings and 
operation.
The Vicinity of the Heater
Do not store or use flammable objects, liquids or vapors near the heater. 
Immediately remove these items if they are present.
See Page 6, Section 3.
Vehicles and Other 
Objects
Maintain the clearances to combustibles.
Do not hang anything from, or place anything on, the heater.
Make sure nothing is lodged in between the heat exchanger or in the louvers.
Immediately remove objects in violation of the clearances to combustibles.
See Page 7, Section 4.
Vent Pipe/Terminals
Venting must be intact. Using a flashlight, look for obstructions, cracks on the 
pipe, gaps in the sealed areas or corrosion.
The area must be free of dirt and dust.
Remove any carbon deposits or scale using a wire brush.
If the vent terminal has a screen built in, remove any dirt, dust or deposits 
from the screen.
See Page 18, Section 8.
Cabinet Exterior
After installation, touch up scratches. Periodic paintings should be done 
thereafter as required. Warning labels and logo labels should be legible and 
accurate. Please contact Roberts-Gordon LLC or ROBERTS GORDON
®
 
independent distributor if you need replacement warning labels or logo labels 
See Page 2, Figure 1 through Page 4, Figure 3.
Combustion Air Intake 
Pipe
Intake pipe and inlet must be intact. Look for obstructions, cracks on the pipe, 
gaps in the sealed areas or corrosion.
The area must be free of dirt and dust. 
Clean and reinstall as required.
See Page 18, Section 8.