United States Stove 6110 Manual Do Utilizador
6
USSC
INSTALLATION OPTIONS
Read this entire manual before you install and use your Multi-Fuel Furnace. Failure to follow instructions
may result in property damage, bodily injury, or even death!
may result in property damage, bodily injury, or even death!
(See specific installation details for clearances and other installation requirements)
As a Primary Furnace—the unit functions independently of any other system. The “Room Air” blowers will come on
when the plenum and Exhaust temperatures reach a preset point on the furnace’s circuit board (PCB).
when the plenum and Exhaust temperatures reach a preset point on the furnace’s circuit board (PCB).
As a Secondary (Add-On) Furnace—the unit aids an existing gas/electric furnace helping cut down on operation time.
It is recommended that only a authorized technician install your Multi-Fuel Furnace, preferably an NFI certified specialist.
Ì
Ì
Ì
Ì
Ì
Installation
IMPROPER INSTALLATION: The manufacturer will not be held responsible for damage caused by the mal-
function of a furnace due to improper venting or installation. Call (800) 750-2723 and/or consult a professional
installer if you have any questions.
function of a furnace due to improper venting or installation. Call (800) 750-2723 and/or consult a professional
installer if you have any questions.
FLOOR PROTECTION
This unit must be installed on a non-combustible floor surface. If a floor pad is used, it should be UL listed or equal. The
floor pad or non-combustible surface should be large enough to extend a minimum of 6-inches in front, 6-inches on each
side, and 1-inch behind the furnace for horizontal termination.
floor pad or non-combustible surface should be large enough to extend a minimum of 6-inches in front, 6-inches on each
side, and 1-inch behind the furnace for horizontal termination.
Floor protection must extend under and 2-inches to each side of the chimney tee for an interior vertical termination.
A Floor Protector of 1 inch thick is recommended for this installation.
ADDITIONAL ITEMS NEEDED FOR INSTALLATION
• UL listed 3 inch or 4 inch (Depending on application) “PL” pellet venting exhaust system.
• Air distribution duct work. Transition from 4.5 inch x 18.5 inch rectangle to 10 inch round is provided.
• Air filter (Optional). Size: 10 x 20 x 1
• Floor Protection (If not installed on a non-combustible floor)
• Air return vent from the house to the room where furnace is installed.
• Fresh air for combustion if located in a small, tightly constructed room.