Lucent Technologies Release 6 Manual Do Utilizador

Página de 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Install and Connect Cabinets 
Page 1-21
Connect DC Power and Ground 
1
7. Connect DC Power to PPN and EPN Cabinets
1. Be sure the main circuit breaker is OFF.
2. Measure and cut a piece of 6 AWG (#40) (16 mm
2
) wire long enough to 
reach from the DC Power Cabinet to the PPN cabinet.
3. At the DC Power Cabinet, connect the -48 volt DC wire to the DC OUTPUT 
circuit breaker. See 
Connect the -48 volt RTN (return) wire to 
the ground discharge bar.
4. Route the wires out of the cabinet, through the hole in the lower rear cover, 
and to the PPN cabinet.
5. Connect the -48 volt DC wire to the -48VDC terminal on the J58890CF 
Power Distribution Unit.
6. Connect the -48 volt RTN wire to the -48RTN terminal on the J58890CF 
Power Distribution Unit terminal block.
7. Repeat Steps 2 through 6 for each EPN and Auxiliary cabinet in the 
system.
8. Connect DC Battery Cabinet to DC Power 
Cabinet
!
CAUTION:
When using battery backup, each cabinet in the system must have a 
dedicated battery backup. The battery backup power cannot be shared 
between cabinets.
1. Set the main circuit breaker on the DC Battery Cabinet and the DC Power 
Cabinet to OFF.
2. Measure and cut a 6 AWG (#40) (16 mm
2
) wire long enough to reach from 
the DC Battery Cabinet’s -48 Volt DC terminal to a DC OUTPUT circuit 
breaker on the DC Power Cabinet.
3. At the DC Battery Cabinet, connect the -48 volt DC wire to the -48 VDC 
connector. Connect the -48 volt RTN wire to the ground connection 
terminal.
4. Route the wires out of the cabinet through the hole in the lower rear cover 
and to the DC Power Cabinet.
5. At the DC Power Cabinet, terminate the -48 volt DC wire on a DC OUTPUT 
circuit breaker. Terminate the -48 volt RTN (return) wire on the ground 
discharge bar.