Install Telecommunications Cabling 
Page 2-24
Cable Installation 
2
Figure 2-14.
3-Pair Modularity for Trunk Pairs for 3-Pair Tie Trunks
Install Cables Between Cabinet and MDF
1. Install “D” rings on the wall between the cable slack manager and the 
terminal/connecting blocks mounted on the MDF.
2. Install a self-adhesive port label on the back of each connector on the 
connector cable. Labels should be positioned so they are not covered by 
the cabinet connector retainers.
3. At the rear of the cabinet, connect 1 end of the connector cable to the 
assigned connector.
4. Route the cable down the rear of the cabinet, through the cable slack 
manager, and to the MDF.
5. At the MDF, connect the other end of the cable to the assigned terminal/ 
connecting block connector.
6. Store the cable slack in the cable slack manager.
7. Repeat Steps 2 through 6 until all cables are installed.
Figure Notes:
1. Green Field 
2. 1-Pair Jumpers
3. Pairs
4. Purple Field
1 2
3
4
5 6
7
8
9 10 11 12
1 2
3
4
5 6
7
8
9 10 11 12
1
2
3
4
5 6
7
8
9 10 11 12
17
16
15
14
13
18 19 20 21 22 23 24
3
r758537b MMR 031496