Teledyne 201A Manual Do Utilizador

Página de 31
Teledyne API Model 201A NH
3
 Analyzer Instruction Manual, 04689, Rev. B1 
3.0 MAINTENANCE SCHEDULE 
3.1  M201A Maintenance Schedule 
The maintenance requirements of the M201A are essentially like a standard M200A 
NOx analyzer.  Please refer to Table 8-1 in the M200A Operator Manual for the M200A 
maintenance schedule. 
In Table 3.1 below, there are the extra maintenance items required by the M201A. 
Table 3.1:  Preventative Maintenance Schedule 
 
Item 
Maintenance Interval 
Reference Section 
M501NH3 Converter  
Check every 6 months 
Section 3.2 
Reaction Cell 
Clean quarterly as 
necessary 
Sect 9.3.8, Fig 8-3 in 
the M200A Manual 
AutoZero flow check 
Quarterly as needed 
Section 3.3 
 
3.2 Maintaining the M501NH Converter 
The M501NH Converter is operated at very high temperature.  The center tube in the 
converter slowly oxidizes and requires replacement.  The most obvious indicator of 
failure is no ammonia conversion, despite the converter being at temperature.  This is 
caused by the oxidized tube breaking off in the converter. 
The following procedure describes how to disassemble and replace converter parts.  
The various parts in the converter become delicate and brittle after prolonged exposure 
to high temperatures.  It is therefore a good idea to have a complete set of replacement 
parts on hand before starting, as listed in Table 3.1. 
18