Roberts Gorden 225 250 Manual Do Utilizador

Página de 52
SECTION 10: O
PERATION
 
AND
 M
AINTENANCE
19
SECTION 10: OPERATION AND MAINTENANCE
Installation, service, and annual inspection of the 
heater must be done by a contractor qualified in the 
installation and service of gas-fired heating 
equipment. Read this manual carefully before 
installation, operation, or service of this equipment. 
All components are accessed via the door secured 
by 4 sheet metal screws. Opening the door exposes 
live electrical connections and hot components.
10.1 Pre-Start-Up Checks 
All pre-start-up checks must be carried out 
before lighting the heater.
Ensure that the heater and all controls are suitable 
for the gas, pressure and electrical supply to which 
they are to be connected.
10.1.1 Louvers 
Where fitted, the air delivery louvers need to be set 
during start-up to give the required air distribution.
10.1.2 Electrical Checks
All pre-start-up checks must be carried out before 
start-up the heater.
1. Check that all site wiring is connected in 
accordance with the appropriate wiring diagram 
on Page 16, Section 9.3
.
10.1.3 Gas Supply
All aspects of the gas installation including the gas 
meter must be inspected, tested for gas tightness 
and purged in accordance with local and national 
codes.
Ensure that the air is fully purged from the heater 
inlet pipe up to the main gas valve inlet test nipple.
10.1.4 Mechanical Checks
1. Check that the fan is free to run and 
delivery louvers are turned to give required 
air deflection.
2. Check that the flue (and air intake for separated 
combustion units) is installed in accordance 
with these instructions and local regulations.
10.2 Begin Start-Up    
10.2.1 Before Operating the Heater
To ensure that all the controls are in safe working 
order, operate the heater for the first time with the 
isolating gas valve turned off and power supply 
turned on.
1. Turn off the isolating gas valve.
2. Turn up the thermostat above room 
temperature. The automatic ignition 
sequence will now begin as described 
on Page 20, Figure 10
.
There will be no ignition of the burner and lockout 
will occur, which proves the controls are operating 
correctly.
WARNING
Electrical Shock Hazard
Use extreme caution during start-up.
Controls compartment contains live electrical
connections.
Failure to follow these instructions can result in
death or electrical shock.
WARNING
Cut Hazard
Turn off gas and electrical supply before maintenance.
Fan can start automatically at any time.
Failure to follow these instructions can result in severe
injury or product damage.