Hardware installation
Rack installation/removal of server
4.2
Rack installation/removal of server
V
CAUTION!
Please observe the safety information and notes on rack mounting in 
chapter 
.
At least two people are needed to install / remove the server in the 
rack. (For the Japanese market, please refer to "
安全上の注意および
その他の重要情報
".)
The rack may tip over if more than one unit is removed at the same 
time.
The server may not occupy the top height units of the rack 
(38HU/42HU PRIMECENTER Rack, DataCenter Rack, 19-inch 
standard rack (for the Japanese market)), as otherwise boards 
cannot be replaced.
4.2.1
Rack system requirements
The rack systems from Fujitsu PRIMECENTER Rack, DataCenter Rack and 
19-inch standard rack (for the Japanese market) support the installation of 
PRIMERGY servers. Installation in most current rack systems from other 
manufacturers (3rd party racks) is also supported.
To accommodate the ventilation concept and ensure proper ventilation, any 
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack. 
Fujitsu rack systems
The main features of PRIMECENTER Rack, DataCenter Rack and 19-inch 
standard rack (for the Japanese market) are as follows:
support systems that can be mounted without tools
support systems having a linear alignment feature to ensure that they can 
be adjusted to different rack depths
PRIMECENTER Rack and DataCenter Rack provide an enhanced cable 
management in the lateral rack area.