Finder Electricity meter (3-phase) digital 65 A MID-approved: Yes 7E.46.8.400.0032 Manual Do Utilizador

Códigos do produto
7E.46.8.400.0032
Página de 4
Finder SpA  
Via Drubiaglio, 14 − 10040 Almese (TO) − Italy  
T +39 011 9346 211 I F +39 011 9359 079  
export@findernet.com I www.finder.de 
Assembly and operating instructions Type 
7E.46 
65 A Three-phase active power energy meter with M-Bus interface, Fig. 1
Description
Energy meter with M-Bus interface enables the reading 
of all relevant data like meter reading, electricity, voltage 
and power (active and *reactive).
Indicating elements 
(Fig. 4)
T1total   
Shows total consumption Tariff 1
T1part.   
Shows partial consumption for 
 
  Tariff 1, this value is resettable
T2total   
Shows total consumption Tariff 2
T2part.   
Shows partial consumption for  
 
 
  Tariff 2, this value is resettable
P(kW) 
 
Shows the instantaneous power 
 
 
  per phase or all phases
U(V) 
 
Shows the voltage per phase
I(A) 
 
Shows the current per phase
100 Imp/kWh 
Pulsates according to drawn power
(Product without MID)  (LCD bar)
1'000 Imp/kWh 
Pulsates according to drawn
(Product with MID)    power (LED)
kWh 
 
Shows the unit kWh when the 
 
 
  consumption is displayed
L1 / L2 / L3 
For P-, U-, I- or Error display, the  
 
  corresponding phase is displayed
Error 
 
In case of missing phase or wrong  
 
  current direction. The corresponding
 
 
  phase is additionally displayed. 
Technical data
Connection  
  Fig. 2
diagram
Dimensions 
Fig. 3
Accuracy class 
B, according to EN 50470-3, 
  Cl. 1  according to IEC 62053-21
Reference, Maxi- 
I
ref
 = 10 A, Im
ax 
= 65 A, Ist
 =
 40 mA
mum, initial current
operating voltage 
3 × 230/400 V AC, 50 Hz
 
  Tolerance −20%/+15%
Counting range 
  00000,00…999999,9 kWh
Ouptut  
  Integrated M-Bus interface 
 
  (see page with telegram structure)
Connections 
Conductor cross-section 1,5…16 mm
2
,
Main circuit 
  Screwdriver Pozi No. 1, slotted 
 
  No. 2, breakaway torque 1,5…2 Nm
Connections 
Conductor cross-section max. 2,5 mm
2
,  
Control circuit 
  Screwdriver Pozi No. 0, slotted 
 
  No. 2, breakaway torque 0,8 Nm
Operating  
−10… +55 °C (noncondensing
temperature 
  according standard EN 50470)
Notes before connecting 
1.   Do not connect L1, L2 or L3 to N
2.   In order to avoid moisture in the meter due to 
condensate build-up, acclimatise the meter at room 
temperature for about half an hour before connecting.
3.   N must always be connected.
Attention!
These devices must only be installed by a professional 
electrician, otherwise there is the risk of fire or the risk 
of an electric shock.
Declaration of Conformity CE
Finder SpA declares at its own responsibility:  
The following energy meters are in compliance: 
7E.46.8.400.0022
 
7E.46.8.400.0032
The following energy meters are approved for energy 
billing:
7E.46.8.400.0032 
which this certificate refer to, are in accordance with 
the following standards: 
EN 50470 parts 1 and 3 (electronic meter), 
    of October 2006. 
 
Directive 2004/22/EG of the European
    parliament and of the council regarding  
    measuring instruments
    • Annex I, essential requirements 
    • Annex MI-003, active electrical energy meters
EC - Declaration of Conformity: 2011
Finder SPA
Conformity Assessment Body: 
 
Zertifizierungstelle METAS-Cert, Nr. 1259
 
CH-3003 Bern-Wabern
Signed:  
Marcello Grande, Technical Manager
English
Installation instructions
The three-phase energy meter can be attached to a 
35 mm rail (EN 60715, TH35). 
The meter can be used only in installation cabinets. 
Operation of the LCD display
See page with LCD menu navigation
4 319 5117 0 
04.2011  
Subject to change without notice
Technical data M-Bus
Bus system 
 
M-Bus
Bus length 
 
According to M-Bus specification 
Transmission rates  
300, 2400, 9600 Bd. 
 
 
 
The transmission rate is automatically detected.
Response time 
 
Write: up to 60 ms
(System response)   
Read: up to 60 ms
Data transfer
When reading out the values, all values are transferred in a telegram.
It supports the following telegrams: 
 
• Initialisation 
 
SND_NKE  
Response: ACK
 
• Reading meter 
 
REQ_UD2  
Response: RSP_UD
 
• Changing primary address  
SND_UD  
Response: ACK
 
• Reset T
part
   
 
SND_UD  
Response: ACK
 
(Further information you will find on the website www.finder.de.)
The device does not respond to unknown queries. 
The transmission rate is automatically detected. 
The device has a voltage monitor. In the case of a power failure, all the registers in the EEPROM are saved.
Changing the M-Bus primary address
In order to change the M-Bus primary address, hold down ►.
In the following menu, ▼ increases the address by 10, ► increases the primary address by 1. 
When the desired address is set, wait until the main display appears again.
English
Unit with multiplier
7E46
I
(Current)
0.1 [ A ]
U
(Voltage)
1 [ V ]
P
active
(Power)
0.01 [ kW ]
P
reactive
(Reactive Power)
0.01 [ kVAR ]
E
(Consumption)
0.01 [ kWh ]
Telegram structure
0x68
0x92
0x92
0x68
0x08
PAdr
0x72
ID
0x2e
0x19
DEV
02
ACC
STAT
0
0
0x8c
0x10
VIF
EtoT1
0x8c
0x11
VIF
EpaT1
0x8c
0x20
VIF
EtoT2
0x8c
0x21
VIF
EpaT2
0x02
0xFD
0xC9
0xFF
0x01
Vph1
0x02
0xFD
VIFE
0xFF
0x01
lph1
0x02
VIF
0xff
0x01
Pph1
0x82
0x40
VIF
0xFF
0x01
Prph1
0x02
0xFD
0xC9
0xFF
0x02
Vph2
0x02
0xFD
VIFE
0xFF
0x02
Iph2
0x02
VIF
0xFF
0x02
Pph2
0x82
0x40
VIF
0xFF
0x02
Prph2
0x02
0xFD
0xC9
0xFF
0x03
Vph3
0x02
0xFD
VIFE
0xFF
0x03
lph3
0x02
VIF
0xFF
0x03
Pph3
0x82
0x40
VIF
0xFF
0x03
Prph3
0x02
0xFF
0x68
RappW 0x02
VIF
0xFF
0x00
Ptot
0x82
0x40
VIF
0xFF
0x00
Prtot
0x01
0xFF
0x13
Cur_Tar Csum
0x16
Variable at 1, 2 or 4 bytes
Byte
Content
Type
Description
Manufacturer-specific
  23 – 26
EtoT1 = x 
4 b. BCD
T1 total
  30 – 33
EpaT1 = x
4 b. BCD
T1 partial
  37 – 40
EtoT2 = x
4 b. BCD
T2 total
  44 – 47
EpaT2 = x
4 b. BCD
T2 partial
  53 – 54
Vph1 = x
2b. Integer
Voltage phase 1
  60 – 61
Iph1 = x
2b. Integer
Current phase 1
  66 – 67
Pph1 = x
2b. Integer
Power phase 1
  73 – 74
Prph1 = x
2b. Integer
Reactive power phase 1
  80 – 81
Vph2 = x
2b. Integer
Voltage phase 2
  87 – 88
Iph2 = x
2b. Integer
Current phase 2
  93 – 94
Pph2 = x
2b. Integer
Power phase 2
100 – 101
Prph2 = x
2b. Integer
Reactive Power phase 2
107 – 108
Vph3 = x
2b. Integer
Voltage phase 3
114 – 115
Iph3 = x
2b. Integer
Current phase 3
120 – 121
Pph3 = x
2b. Integer
Power phase 3
127 – 128
Prph3 = x
2b. Integer
Reactive power phase 3
132 – 133
RappW = x
2b. Integer
Transformer ratio
x (=0 for 7E46)
138 – 139
Ptot = x
2b. Integer
Power total
145 – 146
Prtot = x
2b. Integer
Reaction power total
150
Cur_Tar
1b. Integer
Current tariff
x (=0 for 7E56)
*  The reactive power (idle power) can only be read on 
the M-Bus interface.